Boardwalk Campus (Douglas, Gates, CHECP) is a FLO EV charging station at 75 Spruce Street in Acton, Massachusetts. It lists 6 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | FLO |
| Location | Massachusetts · Acton |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2025-08-08 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: FLO website ↗
Frequently asked questions
How many charging ports does Boardwalk Campus (Douglas, Gates, CHECP) have?
The DOE record lists 6 Level 2 ports.
What connector types are available at Boardwalk Campus (Douglas, Gates, CHECP)?
Listed connector types: J1772 (Type 1).
What are the opening hours of Boardwalk Campus (Douglas, Gates, CHECP)?
The DOE record lists: 24 hours daily.
How much does charging cost at Boardwalk Campus (Douglas, Gates, CHECP)?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Boardwalk Campus (Douglas, Gates, CHECP)?
It is listed on the FLO network.
Nearby charging stations
More FLO stations in Massachusetts →
All stations in Acton →
All charging stations in Massachusetts →