EV Connect · Open

Byers Chevrolet

5887 N Meadows Drive, Grove City, OH 43123

Charging capacity

Directions ↗

Byers Chevrolet is a EV Connect EV charging station at 5887 N Meadows Drive in Grove City, Ohio. It lists 2 DC fast ports, with CCS (J1772 Combo) connectors. Hours: 24 hours daily.

0Level 2 ports
2DC fast ports
2Total ports
PublicAccess

Connector types

CCS (J1772 Combo)

DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.

Station details

NetworkEV Connect
LocationOhio · Grove City
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2023-11-01
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: EV Connect website ↗

Frequently asked questions

How many charging ports does Byers Chevrolet have?

The DOE record lists 2 DC fast ports.

What connector types are available at Byers Chevrolet?

Listed connector types: CCS (J1772 Combo).

What are the opening hours of Byers Chevrolet?

The DOE record lists: 24 hours daily.

How much does charging cost at Byers Chevrolet?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Byers Chevrolet?

It is listed on the EV Connect network.

Nearby charging stations

More EV Connect stations in Ohio →
All stations in Grove City →
All charging stations in Ohio →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.