Cable Care Construction is a Autel EV charging station at 4884 Amsterdam Rd in Schenectady, New York. It lists 2 DC fast ports, with CCS (J1772 Combo) connectors. Hours: 24 hours daily. Pricing noted: $0.40 per kWh.
0Level 2 ports
2DC fast ports
2Total ports
PublicAccess
Connector types
CCS (J1772 Combo)
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | Autel |
| Location | New York · Schenectady |
| Hours | 24 hours daily |
| Pricing | $0.40 per kWh |
| Facility type | Office Bldg |
| Owner type | Private |
| Opened | 2024-09-01 |
| Data last confirmed | 2025-05-12 |
Live availability and current pricing are managed by the operator: Autel website ↗
Frequently asked questions
How many charging ports does Cable Care Construction have?
The DOE record lists 2 DC fast ports.
What connector types are available at Cable Care Construction?
Listed connector types: CCS (J1772 Combo).
What are the opening hours of Cable Care Construction?
The DOE record lists: 24 hours daily.
How much does charging cost at Cable Care Construction?
Pricing noted in the record: $0.40 per kWh. Rates can change, so check the operator for current prices.
Who operates Cable Care Construction?
It is listed on the Autel network.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.