Graff Chevrolet Davison MI is a Red E Charging EV charging station at 800 N State Rd in Davison, Michigan. It lists 2 Level 2 ports and 2 DC fast ports, with CHAdeMO, J1772 (Type 1), CCS (J1772 Combo) connectors.
Connector types
This site has both DC fast charging (the quickest option, suited to road-trip top-ups) and Level 2 charging (slower, suited to longer parking stays).
Station details
| Network | Red E Charging |
| Location | Michigan · Davison |
| Hours | Not specified |
| Pricing | Not listed |
| Facility type | Public |
| Owner type | Not specified |
| Opened | 2023-06-06 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: Red E Charging website ↗
Frequently asked questions
How many charging ports does Graff Chevrolet Davison MI have?
The DOE record lists 2 Level 2 ports and 2 DC fast ports.
What connector types are available at Graff Chevrolet Davison MI?
Listed connector types: CHAdeMO, J1772 (Type 1), CCS (J1772 Combo).
What are the opening hours of Graff Chevrolet Davison MI?
No hours are listed in the DOE record, so confirm with the operator before you go.
How much does charging cost at Graff Chevrolet Davison MI?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Graff Chevrolet Davison MI?
It is listed on the Red E Charging network.