Henry Horton State Park is a Rivian Waypoints EV charging station at 4209 Nashville Highway in Chapel Hill, Tennessee. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
2Level 2 ports
0DC fast ports
2Total ports
PublicAccess
Connector types
J1772 (Type 1)
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | Rivian Waypoints |
| Location | Tennessee · Chapel Hill |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Facility type | Public |
| Owner type | Not specified |
| Opened | 2023-10-03 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: Rivian Waypoints website ↗
Frequently asked questions
How many charging ports does Henry Horton State Park have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Henry Horton State Park?
Listed connector types: J1772 (Type 1).
What are the opening hours of Henry Horton State Park?
The DOE record lists: 24 hours daily.
How much does charging cost at Henry Horton State Park?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Henry Horton State Park?
It is listed on the Rivian Waypoints network.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.