LaQuinta Loveland - Enertech is a Autel EV charging station at 1450 Cascade Ave in Loveland, Colorado. It lists 6 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily. Pricing noted: $0.30 per kWh.
6Level 2 ports
0DC fast ports
6Total ports
PublicAccess
Connector types
J1772 (Type 1)
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | Autel |
| Location | Colorado · Loveland |
| Hours | 24 hours daily |
| Pricing | $0.30 per kWh |
| Facility type | Hotel |
| Owner type | Private |
| Opened | 2025-07-14 |
| Data last confirmed | 2026-02-13 |
Live availability and current pricing are managed by the operator: Autel website ↗
Frequently asked questions
How many charging ports does LaQuinta Loveland - Enertech have?
The DOE record lists 6 Level 2 ports.
What connector types are available at LaQuinta Loveland - Enertech?
Listed connector types: J1772 (Type 1).
What are the opening hours of LaQuinta Loveland - Enertech?
The DOE record lists: 24 hours daily.
How much does charging cost at LaQuinta Loveland - Enertech?
Pricing noted in the record: $0.30 per kWh. Rates can change, so check the operator for current prices.
Who operates LaQuinta Loveland - Enertech?
It is listed on the Autel network.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.