Larry Clark Chevrolet Buick Cadillac GMC is a EV Connect EV charging station at 533 Hwy 278 West in Amory, Mississippi. It lists 2 DC fast ports, with CCS (J1772 Combo) connectors. Hours: 24 hours daily.
0Level 2 ports
2DC fast ports
2Total ports
PublicAccess
Connector types
CCS (J1772 Combo)
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | EV Connect |
| Location | Mississippi · Amory |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2024-06-07 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: EV Connect website ↗
Frequently asked questions
How many charging ports does Larry Clark Chevrolet Buick Cadillac GMC have?
The DOE record lists 2 DC fast ports.
What connector types are available at Larry Clark Chevrolet Buick Cadillac GMC?
Listed connector types: CCS (J1772 Combo).
What are the opening hours of Larry Clark Chevrolet Buick Cadillac GMC?
The DOE record lists: 24 hours daily.
How much does charging cost at Larry Clark Chevrolet Buick Cadillac GMC?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Larry Clark Chevrolet Buick Cadillac GMC?
It is listed on the EV Connect network.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.