MBTA New Bedford Station is a EV charging station at 532 Acushnet Ave in New Bedford, Massachusetts. It lists 4 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
4Level 2 ports
0DC fast ports
4Total ports
PublicAccess
Connector types
J1772 (Type 1)
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | Independent / non-networked |
| Location | Massachusetts · New Bedford |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Facility type | State Gov |
| Owner type | State government |
| Opened | 2025-05-26 |
| Data last confirmed | 2026-02-13 |
Frequently asked questions
How many charging ports does MBTA New Bedford Station have?
The DOE record lists 4 Level 2 ports.
What connector types are available at MBTA New Bedford Station?
Listed connector types: J1772 (Type 1).
What are the opening hours of MBTA New Bedford Station?
The DOE record lists: 24 hours daily.
How much does charging cost at MBTA New Bedford Station?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates MBTA New Bedford Station?
It is listed as an independent (non-networked) station.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.