FLO · Open

North Ridgeville City Hall

7307 Avon Belden Road, North Ridgeville, OH 44039

Charging capacity

Directions ↗

North Ridgeville City Hall is a FLO EV charging station at 7307 Avon Belden Road in North Ridgeville, Ohio. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkFLO
LocationOhio · North Ridgeville
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2026-01-22
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: FLO website ↗

Frequently asked questions

How many charging ports does North Ridgeville City Hall have?

The DOE record lists 2 Level 2 ports.

What connector types are available at North Ridgeville City Hall?

Listed connector types: J1772 (Type 1).

What are the opening hours of North Ridgeville City Hall?

The DOE record lists: 24 hours daily.

How much does charging cost at North Ridgeville City Hall?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates North Ridgeville City Hall?

It is listed on the FLO network.

Nearby charging stations

More FLO stations in Ohio →
All charging stations in Ohio →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.