Blink · Open

Premier Design Group

100 Midland Park Drive, Wentzville, MO 63385

Charging capacity

Directions ↗

Premier Design Group is a Blink EV charging station at 100 Midland Park Drive in Wentzville, Missouri. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkBlink
LocationMissouri · Wentzville
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2022-09-15
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: Blink website ↗

Frequently asked questions

How many charging ports does Premier Design Group have?

The DOE record lists 2 Level 2 ports.

What connector types are available at Premier Design Group?

Listed connector types: J1772 (Type 1).

What are the opening hours of Premier Design Group?

The DOE record lists: 24 hours daily.

How much does charging cost at Premier Design Group?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Premier Design Group?

It is listed on the Blink network.

Nearby charging stations

More Blink stations in Missouri →
All stations in Wentzville →
All charging stations in Missouri →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.