SynergEV · Open

Redlands Packing House District I

560 W. Stuart Ave., Redlands, CA 92374

Charging capacity

Directions ↗

Redlands Packing House District I is a SynergEV EV charging station at 560 W. Stuart Ave. in Redlands, California. It lists 12 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

12Level 2 ports
0DC fast ports
12Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkSynergEV
LocationCalifornia · Redlands
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2026-03-04
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: SynergEV website ↗

Frequently asked questions

How many charging ports does Redlands Packing House District I have?

The DOE record lists 12 Level 2 ports.

What connector types are available at Redlands Packing House District I?

Listed connector types: J1772 (Type 1).

What are the opening hours of Redlands Packing House District I?

The DOE record lists: 24 hours daily.

How much does charging cost at Redlands Packing House District I?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Redlands Packing House District I?

It is listed on the SynergEV network.

Nearby charging stations

More SynergEV stations in California →
All stations in Redlands →
All charging stations in California →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.