EV Connect · Planned

Seth Wadley Chevrolet Buick GMC Cadillac

400 BALLARD RD, Pauls Valley, OK 73075

Charging capacity

Directions ↗

Seth Wadley Chevrolet Buick GMC Cadillac is a EV Connect EV charging station at 400 BALLARD RD in Pauls Valley, Oklahoma. It lists 1 Level 2 port and 1 DC fast port, with J1772 (Type 1), CCS (J1772 Combo) connectors. Hours: 24 hours daily.

1Level 2 ports
1DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)CCS (J1772 Combo)

This site has both DC fast charging (the quickest option, suited to road-trip top-ups) and Level 2 charging (slower, suited to longer parking stays).

Station details

NetworkEV Connect
LocationOklahoma · Pauls Valley
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2023-11-14
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: EV Connect website ↗

Frequently asked questions

How many charging ports does Seth Wadley Chevrolet Buick GMC Cadillac have?

The DOE record lists 1 Level 2 port and 1 DC fast port.

What connector types are available at Seth Wadley Chevrolet Buick GMC Cadillac?

Listed connector types: J1772 (Type 1), CCS (J1772 Combo).

What are the opening hours of Seth Wadley Chevrolet Buick GMC Cadillac?

The DOE record lists: 24 hours daily.

How much does charging cost at Seth Wadley Chevrolet Buick GMC Cadillac?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Seth Wadley Chevrolet Buick GMC Cadillac?

It is listed on the EV Connect network.

Nearby charging stations

More EV Connect stations in Oklahoma →
All charging stations in Oklahoma →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.