Walmart 6998 (East Point, GA) is a Electrify America EV charging station at 844 Cleveland Avenue in East Point, Georgia. It lists 8 DC fast ports, with CCS (J1772 Combo) connectors. Hours: 24 hours daily.
0Level 2 ports
8DC fast ports
8Total ports
PublicAccess
Connector types
CCS (J1772 Combo)
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | Electrify America |
| Location | Georgia · East Point |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2020-09-17 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: Electrify America website ↗
Frequently asked questions
How many charging ports does Walmart 6998 (East Point, GA) have?
The DOE record lists 8 DC fast ports.
What connector types are available at Walmart 6998 (East Point, GA)?
Listed connector types: CCS (J1772 Combo).
What are the opening hours of Walmart 6998 (East Point, GA)?
The DOE record lists: 24 hours daily.
How much does charging cost at Walmart 6998 (East Point, GA)?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Walmart 6998 (East Point, GA)?
It is listed on the Electrify America network.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.