Water Treatment Plant is a EV Connect EV charging station at 1070 NEPPERHAN AVE in Yonkers, New York. It lists 6 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | EV Connect |
| Location | New York · Yonkers |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2023-12-06 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: EV Connect website ↗
Frequently asked questions
How many charging ports does Water Treatment Plant have?
The DOE record lists 6 Level 2 ports.
What connector types are available at Water Treatment Plant?
Listed connector types: J1772 (Type 1).
What are the opening hours of Water Treatment Plant?
The DOE record lists: 24 hours daily.
How much does charging cost at Water Treatment Plant?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Water Treatment Plant?
It is listed on the EV Connect network.
Nearby charging stations
More EV Connect stations in New York →
All stations in Yonkers →
All charging stations in New York →