Westminster Village is a FCN EV charging station at 10601 S Western Ave in Oklahoma City, Oklahoma. It lists 8 DC fast ports, with CHAdeMO, CCS (J1772 Combo) connectors. Hours: 24 hours daily.
0Level 2 ports
8DC fast ports
8Total ports
PublicAccess
Connector types
CHAdeMOCCS (J1772 Combo)
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | FCN |
| Location | Oklahoma · Oklahoma City |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2020-12-11 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: FCN website ↗
Frequently asked questions
How many charging ports does Westminster Village have?
The DOE record lists 8 DC fast ports.
What connector types are available at Westminster Village?
Listed connector types: CHAdeMO, CCS (J1772 Combo).
What are the opening hours of Westminster Village?
The DOE record lists: 24 hours daily.
How much does charging cost at Westminster Village?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Westminster Village?
It is listed on the FCN network.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.