ChargePoint · Open

Bellingham City Cordata Park 1

4530 Cordata Pkwy, Bellingham, WA 98226

Charging capacity

Directions ↗

Bellingham City Cordata Park 1 is a ChargePoint EV charging station at 4530 Cordata Pkwy in Bellingham, Washington. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationWashington · Bellingham
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2024-11-16
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Bellingham City Cordata Park 1 have?

The DOE record lists 2 Level 2 ports.

What connector types are available at Bellingham City Cordata Park 1?

Listed connector types: J1772 (Type 1).

What are the opening hours of Bellingham City Cordata Park 1?

The DOE record lists: 24 hours daily.

How much does charging cost at Bellingham City Cordata Park 1?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Bellingham City Cordata Park 1?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Washington →
All stations in Bellingham →
All charging stations in Washington →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.