ChargePoint · Open

Bernie Bishop Detail Shop

616 Hemlock St, Brookings, OR 97415

Charging capacity

Directions ↗

Bernie Bishop Detail Shop is a ChargePoint EV charging station at 616 Hemlock St in Brookings, Oregon. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationOregon · Brookings
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2022-08-03
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Bernie Bishop Detail Shop have?

The DOE record lists 2 Level 2 ports.

What connector types are available at Bernie Bishop Detail Shop?

Listed connector types: J1772 (Type 1).

What are the opening hours of Bernie Bishop Detail Shop?

The DOE record lists: 24 hours daily.

How much does charging cost at Bernie Bishop Detail Shop?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Bernie Bishop Detail Shop?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Oregon →
All stations in Brookings →
All charging stations in Oregon →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.