Bluepath Cc 6 is a ChargePoint EV charging station at 74 Wintun Ct in Napa, California. It lists 1 Level 2 port, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | California · Napa |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2025-09-05 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Bluepath Cc 6 have?
The DOE record lists 1 Level 2 port.
What connector types are available at Bluepath Cc 6?
Listed connector types: J1772 (Type 1).
What are the opening hours of Bluepath Cc 6?
The DOE record lists: 24 hours daily.
How much does charging cost at Bluepath Cc 6?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Bluepath Cc 6?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in California →
All stations in Napa →
All charging stations in California →