Bosa D. Group L1 390 Ada is a ChargePoint EV charging station at 702 7th Ave in San Diego, California. It lists 1 Level 2 port, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | California · San Diego |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2022-04-09 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Bosa D. Group L1 390 Ada have?
The DOE record lists 1 Level 2 port.
What connector types are available at Bosa D. Group L1 390 Ada?
Listed connector types: J1772 (Type 1).
What are the opening hours of Bosa D. Group L1 390 Ada?
The DOE record lists: 24 hours daily.
How much does charging cost at Bosa D. Group L1 390 Ada?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Bosa D. Group L1 390 Ada?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in California →
All stations in San Diego →
All charging stations in California →