ChargePoint · Open

Breckenridge Public Works1

1095 Airport Rd, Breckenridge, CO 80424

Charging capacity

Directions ↗

Breckenridge Public Works1 is a ChargePoint EV charging station at 1095 Airport Rd in Breckenridge, Colorado. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationColorado · Breckenridge
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2020-12-25
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Breckenridge Public Works1 have?

The DOE record lists 2 Level 2 ports.

What connector types are available at Breckenridge Public Works1?

Listed connector types: J1772 (Type 1).

What are the opening hours of Breckenridge Public Works1?

The DOE record lists: 24 hours daily.

How much does charging cost at Breckenridge Public Works1?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Breckenridge Public Works1?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Colorado →
All stations in Breckenridge →
All charging stations in Colorado →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.