Brightridge EV Station 2 (R) is a ChargePoint EV charging station at 110 Cherry Street in Johnson City, Tennessee. It lists 1 DC fast port, with CCS (J1772 Combo), Tesla / NACS connectors. Hours: 24 hours daily.
Connector types
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking. Tesla / NACS connectors are listed; check the operator for adapter or vehicle-compatibility rules.
Station details
| Network | ChargePoint |
| Location | Tennessee · Johnson City |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2024-05-07 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Brightridge EV Station 2 (R) have?
The DOE record lists 1 DC fast port.
What connector types are available at Brightridge EV Station 2 (R)?
Listed connector types: CCS (J1772 Combo), Tesla / NACS.
What are the opening hours of Brightridge EV Station 2 (R)?
The DOE record lists: 24 hours daily.
How much does charging cost at Brightridge EV Station 2 (R)?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Brightridge EV Station 2 (R)?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Tennessee →
All stations in Johnson City →
All charging stations in Tennessee →