ChargePoint · Open

City Of Toledo City Hall

200 N Main St, Toledo, OR 97391

Charging capacity

Directions ↗

City Of Toledo City Hall is a ChargePoint EV charging station at 200 N Main St in Toledo, Oregon. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationOregon · Toledo
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2021-06-23
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does City Of Toledo City Hall have?

The DOE record lists 2 Level 2 ports.

What connector types are available at City Of Toledo City Hall?

Listed connector types: J1772 (Type 1).

What are the opening hours of City Of Toledo City Hall?

The DOE record lists: 24 hours daily.

How much does charging cost at City Of Toledo City Hall?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates City Of Toledo City Hall?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Oregon →
All stations in Toledo →
All charging stations in Oregon →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.