Co Xeo Severance 2 is a ChargePoint EV charging station at 7 Timber Ridge Parkway in Severance, Colorado. It lists 2 DC fast ports, with CCS (J1772 Combo) connectors. Hours: 24 hours daily.
0Level 2 ports
2DC fast ports
2Total ports
PublicAccess
Connector types
CCS (J1772 Combo)
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | ChargePoint |
| Location | Colorado · Severance |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2025-08-01 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Co Xeo Severance 2 have?
The DOE record lists 2 DC fast ports.
What connector types are available at Co Xeo Severance 2?
Listed connector types: CCS (J1772 Combo).
What are the opening hours of Co Xeo Severance 2?
The DOE record lists: 24 hours daily.
How much does charging cost at Co Xeo Severance 2?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Co Xeo Severance 2?
It is listed on the ChargePoint network.
Nearby charging stations
Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.