ChargePoint · Open

Cok City Hall

1-99 E 23rd St, Kearney, NE 68847

Charging capacity

Directions ↗

Cok City Hall is a ChargePoint EV charging station at 1-99 E 23rd St in Kearney, Nebraska. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationNebraska · Kearney
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2020-07-07
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Cok City Hall have?

The DOE record lists 2 Level 2 ports.

What connector types are available at Cok City Hall?

Listed connector types: J1772 (Type 1).

What are the opening hours of Cok City Hall?

The DOE record lists: 24 hours daily.

How much does charging cost at Cok City Hall?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Cok City Hall?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Nebraska →
All stations in Kearney →
All charging stations in Nebraska →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.