Dcpud Wells Dam Pl 1 is a ChargePoint EV charging station at 375 Azwell Road in Chelan, Washington. It lists 2 DC fast ports, with CCS (J1772 Combo) connectors. Hours: 24 hours daily.
Connector types
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | ChargePoint |
| Location | Washington · Chelan |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2024-11-16 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Dcpud Wells Dam Pl 1 have?
The DOE record lists 2 DC fast ports.
What connector types are available at Dcpud Wells Dam Pl 1?
Listed connector types: CCS (J1772 Combo).
What are the opening hours of Dcpud Wells Dam Pl 1?
The DOE record lists: 24 hours daily.
How much does charging cost at Dcpud Wells Dam Pl 1?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Dcpud Wells Dam Pl 1?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Washington →
All stations in Chelan →
All charging stations in Washington →