ChargePoint · Open

Enterprise Enterprise 20b1

32805 Northwestern Highway, Farmington Hills, MI 48334

Charging capacity

Directions ↗

Enterprise Enterprise 20b1 is a ChargePoint EV charging station at 32805 Northwestern Highway in Farmington Hills, Michigan. It lists 1 Level 2 port, with J1772 (Type 1) connectors. Hours: 24 hours daily.

1Level 2 ports
0DC fast ports
1Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationMichigan · Farmington Hills
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2025-10-16
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Enterprise Enterprise 20b1 have?

The DOE record lists 1 Level 2 port.

What connector types are available at Enterprise Enterprise 20b1?

Listed connector types: J1772 (Type 1).

What are the opening hours of Enterprise Enterprise 20b1?

The DOE record lists: 24 hours daily.

How much does charging cost at Enterprise Enterprise 20b1?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Enterprise Enterprise 20b1?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Michigan →
All stations in Farmington Hills →
All charging stations in Michigan →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.