Evslcc Ct 3 is a ChargePoint EV charging station at 1830 W Community Blvd in Salt Lake City, Utah. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | Utah · Salt Lake City |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2021-06-23 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Evslcc Ct 3 have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Evslcc Ct 3?
Listed connector types: J1772 (Type 1).
What are the opening hours of Evslcc Ct 3?
The DOE record lists: 24 hours daily.
How much does charging cost at Evslcc Ct 3?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Evslcc Ct 3?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Utah →
All stations in Salt Lake City →
All charging stations in Utah →