ChargePoint · Open

Georgia Power Richland DC 1

26 Stewart St, Richland, GA 31825

Charging capacity

Directions ↗

Georgia Power Richland DC 1 is a ChargePoint EV charging station at 26 Stewart St in Richland, Georgia. It lists 1 DC fast port, with CCS (J1772 Combo), Tesla / NACS connectors. Hours: 24 hours daily.

0Level 2 ports
1DC fast ports
1Total ports
PublicAccess

Connector types

CCS (J1772 Combo)Tesla / NACS

DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking. Tesla / NACS connectors are listed; check the operator for adapter or vehicle-compatibility rules.

Station details

NetworkChargePoint
LocationGeorgia · Richland
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2024-04-18
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Georgia Power Richland DC 1 have?

The DOE record lists 1 DC fast port.

What connector types are available at Georgia Power Richland DC 1?

Listed connector types: CCS (J1772 Combo), Tesla / NACS.

What are the opening hours of Georgia Power Richland DC 1?

The DOE record lists: 24 hours daily.

How much does charging cost at Georgia Power Richland DC 1?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Georgia Power Richland DC 1?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Georgia →
All charging stations in Georgia →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.