L840 Cpe250 2 is a ChargePoint EV charging station at 1950 Orion Dr in Decatur, Georgia. It lists 1 DC fast port, with CHAdeMO, CCS (J1772 Combo) connectors. Hours: Mon: 7:00am-8:00pm; Tue: 7:00am-8:00pm; Wed: 7:00am-8:00pm; Thu: 7:00am-8:00pm; Fri: 7:00am-8:00pm; Sat: 7:00am-6:00pm.
Connector types
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | ChargePoint |
| Location | Georgia · Decatur |
| Hours | Mon: 7:00am-8:00pm; Tue: 7:00am-8:00pm; Wed: 7:00am-8:00pm; Thu: 7:00am-8:00pm; Fri: 7:00am-8:00pm; Sat: 7:00am-6:00pm |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2023-02-07 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does L840 Cpe250 2 have?
The DOE record lists 1 DC fast port.
What connector types are available at L840 Cpe250 2?
Listed connector types: CHAdeMO, CCS (J1772 Combo).
What are the opening hours of L840 Cpe250 2?
The DOE record lists: Mon: 7:00am-8:00pm; Tue: 7:00am-8:00pm; Wed: 7:00am-8:00pm; Thu: 7:00am-8:00pm; Fri: 7:00am-8:00pm; Sat: 7:00am-6:00pm.
How much does charging cost at L840 Cpe250 2?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates L840 Cpe250 2?
It is listed on the ChargePoint network.