ChargePoint · Open

Lane County Lc Psb2

675 Oak Street, Eugene, OR 97401

Charging capacity

Directions ↗

Lane County Lc Psb2 is a ChargePoint EV charging station at 675 Oak Street in Eugene, Oregon. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.

2Level 2 ports
0DC fast ports
2Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationOregon · Eugene
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2024-09-28
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Lane County Lc Psb2 have?

The DOE record lists 2 Level 2 ports.

What connector types are available at Lane County Lc Psb2?

Listed connector types: J1772 (Type 1).

What are the opening hours of Lane County Lc Psb2?

The DOE record lists: 24 hours daily.

How much does charging cost at Lane County Lc Psb2?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Lane County Lc Psb2?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Oregon →
All stations in Eugene →
All charging stations in Oregon →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.