Manitousprings Hiawatha Ty2e is a ChargePoint EV charging station at 10 Old Man's Trail in Manitou Springs, Colorado. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | Colorado · Manitou Springs |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2023-07-25 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Manitousprings Hiawatha Ty2e have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Manitousprings Hiawatha Ty2e?
Listed connector types: J1772 (Type 1).
What are the opening hours of Manitousprings Hiawatha Ty2e?
The DOE record lists: 24 hours daily.
How much does charging cost at Manitousprings Hiawatha Ty2e?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Manitousprings Hiawatha Ty2e?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Colorado →
All stations in Manitou Springs →
All charging stations in Colorado →