Maverick Mav HQ 1 is a ChargePoint EV charging station at 1 Westinghouse Plaza BLDG. D in Boston, Massachusetts. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | Massachusetts · Boston |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2021-07-10 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Maverick Mav HQ 1 have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Maverick Mav HQ 1?
Listed connector types: J1772 (Type 1).
What are the opening hours of Maverick Mav HQ 1?
The DOE record lists: 24 hours daily.
How much does charging cost at Maverick Mav HQ 1?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Maverick Mav HQ 1?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Massachusetts →
All stations in Boston →
All charging stations in Massachusetts →