ChargePoint · Open

Meijer Stores 50 Cascade 2

5531 28th St SE, Grand Rapids, MI 49512

Charging capacity

Directions ↗

Meijer Stores 50 Cascade 2 is a ChargePoint EV charging station at 5531 28th St SE in Grand Rapids, Michigan. It lists 1 DC fast port, with CHAdeMO, CCS (J1772 Combo) connectors. Hours: 24 hours daily.

0Level 2 ports
1DC fast ports
1Total ports
PublicAccess

Connector types

CHAdeMOCCS (J1772 Combo)

DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.

Station details

NetworkChargePoint
LocationMichigan · Grand Rapids
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2020-11-05
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Meijer Stores 50 Cascade 2 have?

The DOE record lists 1 DC fast port.

What connector types are available at Meijer Stores 50 Cascade 2?

Listed connector types: CHAdeMO, CCS (J1772 Combo).

What are the opening hours of Meijer Stores 50 Cascade 2?

The DOE record lists: 24 hours daily.

How much does charging cost at Meijer Stores 50 Cascade 2?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Meijer Stores 50 Cascade 2?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in Michigan →
All stations in Grand Rapids →
All charging stations in Michigan →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.