ChargePoint · Open

Noda Flats Station 2

2509 North Davidson Street, Charlotte, NC 28205

Charging capacity

Directions ↗

Noda Flats Station 2 is a ChargePoint EV charging station at 2509 North Davidson Street in Charlotte, North Carolina. It lists 1 Level 2 port, with J1772 (Type 1) connectors. Hours: 24 hours daily.

1Level 2 ports
0DC fast ports
1Total ports
PublicAccess

Connector types

J1772 (Type 1)

Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.

Station details

NetworkChargePoint
LocationNorth Carolina · Charlotte
Hours24 hours daily
PricingNot listed
Owner typeNot specified
Opened2025-07-26
Data last confirmed2026-08-30

Live availability and current pricing are managed by the operator: ChargePoint website ↗

Frequently asked questions

How many charging ports does Noda Flats Station 2 have?

The DOE record lists 1 Level 2 port.

What connector types are available at Noda Flats Station 2?

Listed connector types: J1772 (Type 1).

What are the opening hours of Noda Flats Station 2?

The DOE record lists: 24 hours daily.

How much does charging cost at Noda Flats Station 2?

No pricing is listed in the DOE record. Check the network's app or website for current rates.

Who operates Noda Flats Station 2?

It is listed on the ChargePoint network.

Nearby charging stations

More ChargePoint stations in North Carolina →
All stations in Charlotte →
All charging stations in North Carolina →

Reference data only — from the U.S. Department of Energy's Alternative Fuels Data Center (snapshot August 30, 2026). Status, pricing and availability change frequently; confirm with the network before relying on this station for a trip.