Red Soils Dsb Fleet 2 is a ChargePoint EV charging station at 150 Beavercreek Rd. in Oregon City, Oregon. It lists 1 Level 2 port, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | Oregon · Oregon City |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2025-07-10 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Red Soils Dsb Fleet 2 have?
The DOE record lists 1 Level 2 port.
What connector types are available at Red Soils Dsb Fleet 2?
Listed connector types: J1772 (Type 1).
What are the opening hours of Red Soils Dsb Fleet 2?
The DOE record lists: 24 hours daily.
How much does charging cost at Red Soils Dsb Fleet 2?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Red Soils Dsb Fleet 2?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Oregon →
All stations in Oregon City →
All charging stations in Oregon →