Rioer Nevi Dcfc 2 is a ChargePoint EV charging station at 292 Centerville Road in Warwick, Rhode Island. It lists 2 DC fast ports, with CCS (J1772 Combo) connectors. Hours: 24 hours daily.
Connector types
DC fast charging is the quickest category, suited to road-trip top-ups rather than overnight parking.
Station details
| Network | ChargePoint |
| Location | Rhode Island · Warwick |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2024-05-31 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Rioer Nevi Dcfc 2 have?
The DOE record lists 2 DC fast ports.
What connector types are available at Rioer Nevi Dcfc 2?
Listed connector types: CCS (J1772 Combo).
What are the opening hours of Rioer Nevi Dcfc 2?
The DOE record lists: 24 hours daily.
How much does charging cost at Rioer Nevi Dcfc 2?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Rioer Nevi Dcfc 2?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Rhode Island →
All stations in Warwick →
All charging stations in Rhode Island →