Timber Creek EV Station 01 is a ChargePoint EV charging station at 1623 Benson Rd in Garner, North Carolina. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | North Carolina · Garner |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2022-07-17 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Timber Creek EV Station 01 have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Timber Creek EV Station 01?
Listed connector types: J1772 (Type 1).
What are the opening hours of Timber Creek EV Station 01?
The DOE record lists: 24 hours daily.
How much does charging cost at Timber Creek EV Station 01?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Timber Creek EV Station 01?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in North Carolina →
All stations in Garner →
All charging stations in North Carolina →