Townofwellesley Waban Lot 2 is a ChargePoint EV charging station at 1 Waban St in Wellesley, Massachusetts. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | Massachusetts · Wellesley |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2024-07-10 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Townofwellesley Waban Lot 2 have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Townofwellesley Waban Lot 2?
Listed connector types: J1772 (Type 1).
What are the opening hours of Townofwellesley Waban Lot 2?
The DOE record lists: 24 hours daily.
How much does charging cost at Townofwellesley Waban Lot 2?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Townofwellesley Waban Lot 2?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Massachusetts →
All stations in Wellesley →
All charging stations in Massachusetts →