Waterview Ob Station 2 is a ChargePoint EV charging station at 1919 N Lynn St in Arlington, Virginia. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | Virginia · Arlington |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2022-09-27 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Waterview Ob Station 2 have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Waterview Ob Station 2?
Listed connector types: J1772 (Type 1).
What are the opening hours of Waterview Ob Station 2?
The DOE record lists: 24 hours daily.
How much does charging cost at Waterview Ob Station 2?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Waterview Ob Station 2?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in Virginia →
All stations in Arlington →
All charging stations in Virginia →