Wayne_cc Ash_ev2 is a ChargePoint EV charging station at 3000 Wayne Memorial Drive Ash Building in Goldsboro, North Carolina. It lists 2 Level 2 ports, with J1772 (Type 1) connectors. Hours: 24 hours daily.
Connector types
Level 2 charging is slower than DC fast and suits longer stops such as shopping, work or an overnight stay.
Station details
| Network | ChargePoint |
| Location | North Carolina · Goldsboro |
| Hours | 24 hours daily |
| Pricing | Not listed |
| Owner type | Not specified |
| Opened | 2023-08-19 |
| Data last confirmed | 2026-08-30 |
Live availability and current pricing are managed by the operator: ChargePoint website ↗
Frequently asked questions
How many charging ports does Wayne_cc Ash_ev2 have?
The DOE record lists 2 Level 2 ports.
What connector types are available at Wayne_cc Ash_ev2?
Listed connector types: J1772 (Type 1).
What are the opening hours of Wayne_cc Ash_ev2?
The DOE record lists: 24 hours daily.
How much does charging cost at Wayne_cc Ash_ev2?
No pricing is listed in the DOE record. Check the network's app or website for current rates.
Who operates Wayne_cc Ash_ev2?
It is listed on the ChargePoint network.
Nearby charging stations
More ChargePoint stations in North Carolina →
All stations in Goldsboro →
All charging stations in North Carolina →